LE 03 ConstructionLE 03 Construction
The Fuser unit is only available as one
unit.
The most important specifications are:
Fuser unit
1 contact Thermostat on the edge of the
heat roller.
2 Thermistor’s for controlling overheat .
2 Fuser heater
Drive start timing: 135°C
Ready : 150°C
°
The disassembling of the fuser unit is
complicated.
A reset in Maintenance Mode isn’t necessary after C6XXX error code.
Reset is possible by power off/on the system.
Comments to this Manuals